Bubba Gump Sandgate
New freezer room and cold room, plus relocation of an existing cold room from outside to inside as part of a coordinated venue refurbishment.



3 photos
The Challenge
The restaurant refurbishment required coordinated air conditioning, cold storage, beer dispensing, kitchen ventilation and electrical works.
Our Solution
HVACR Group brought together Shelair, ACRO Refrigeration and Beer Works to deliver the confirmed refurbishment scope: Replaced 14 air-conditioning units; Built a new freezer room and cold room; Relocated an existing cold room from outside to inside; Installed the complete beer system from glycol unit to taps; Supplied and installed the kitchen hood, kitchen exhaust and associated ductwork; Completed all associated electrical works.
Results & Outcomes
More Projects
Refrigeration Emergency? We're On Call 24/7.
Don't lose stock to a breakdown. Call now or book a maintenance plan to prevent it happening in the first place.