Acro Refrigeration registered trade mark logo®Acro Refrigeration
    Hospitality refurbishment

    Bubba Gump Sandgate

    New freezer room and cold room, plus relocation of an existing cold room from outside to inside as part of a coordinated venue refurbishment.

    Sandgate, Queensland
    Bubba Gump Sandgate
    New and relocated cold storage
    Bubba Gump Sandgate — image 1
    Bubba Gump Sandgate — image 2
    Bubba Gump Sandgate — image 3

    3 photos

    The Challenge

    The restaurant refurbishment required coordinated air conditioning, cold storage, beer dispensing, kitchen ventilation and electrical works.

    Our Solution

    HVACR Group brought together Shelair, ACRO Refrigeration and Beer Works to deliver the confirmed refurbishment scope: Replaced 14 air-conditioning units; Built a new freezer room and cold room; Relocated an existing cold room from outside to inside; Installed the complete beer system from glycol unit to taps; Supplied and installed the kitchen hood, kitchen exhaust and associated ductwork; Completed all associated electrical works.

    Results & Outcomes

    Replaced 14 air-conditioning units
    Built a new freezer room and cold room
    Relocated an existing cold room from outside to inside
    Installed the complete beer system from glycol unit to taps
    Supplied and installed the kitchen hood, kitchen exhaust and associated ductwork
    Completed all associated electrical works

    Refrigeration Emergency? We're On Call 24/7.

    Don't lose stock to a breakdown. Call now or book a maintenance plan to prevent it happening in the first place.

    Call Now Request Service